How a sheet membrane works
A sheet membrane is a manufactured polyethylene sheet, bonded to studs and subfloor in a thin-set mortar bed and pressed in with diagonal trowel sweeps to eliminate air pockets underneath.[1]
Seams are handled in one of two ways: overlapping two edges by 2 inches within the mortar, or butting the edges and covering the joint with a separate banding strip set in its own layer of thin-set.[1]
One system's instructions call for a 24-hour wait after the full membrane assembly is bonded before tile goes over it, giving the mortar time to set at the seams and connections.[1]
How a liquid membrane works
A liquid membrane is rolled on like a thick paint, curing into a rubbery, continuous coating directly on the wall and pan surface, with no sheet material or seams to manage.
One widely used liquid product is listed for use as a shower pan liner and also meets a separate standard for crack-prevention membranes, and it's specifically called out as approved for steam shower installations.[2]
What each approach asks of the installer
A sheet membrane arrives at a factory-set thickness everywhere it's used; the installer's job is bonding it correctly and sealing every seam, not building up thickness by hand.
A liquid membrane's thickness depends entirely on how it's applied. Getting even coverage with no thin spots, especially into corners and around the drain, takes more attention from the installer than rolling out a pre-made sheet.
Where each tends to get chosen
A sheet system is a common choice for a straightforward rectangular shower where consistent thickness and a faster path to tiling matter.
A liquid membrane is often chosen for irregular shapes, curbless transitions, or steam showers, where a paint-on coating can follow a complex geometry more easily than cutting and fitting sheet material.
What to ask your contractor either way
Ask which specific product they're using and whether it's rated for the standard that applies to that use, a pan liner, a crack-prevention layer, or full wall waterproofing, since a single product isn't always approved for all three.
Ask how they handle the corners and the drain connection specifically, since these are the two spots where both membrane types most commonly fail if installation is rushed.
If you're paying for a warranty tied to the waterproofing system, ask what voids it. Some manufacturer warranties require their full system, membrane, mortar and sometimes even tile adhesive, to apply, and mixing in an unapproved product can quietly void coverage without anyone realizing it until a leak shows up.
Keep a copy of the specific product names used, including the batch or lot number if it's printed on the packaging, in case a warranty claim ever needs to reference exactly what went into the wall.